RAIL CONCRETE · TRACKSIDE · POSSESSIONS · NETWORK RAIL

Track handed back by 05:30. Every time.

T-3 and T-12 possessions are unforgiving. Procon pours from depot through the night, sets in two hours with URS, and certifies the work before the first commuter service. Drivers inducted to your possession, BS EN 206 paperwork in the cab.

Quote answered inside 30 minutes.

// SAMPLE JOB DOCKET
REF
24-0411
Window
Possession 23:50 to 05:30, pour 02:15
Where
TransPennine Up Main, Stalybridge
Spec
URS 450, 8 m³, 75 mm slump
Truck
Volumetric, mix on chute
Paper
EN 206 + BS 8500, in cab, hand-back form attached
Driver
Inducted to possession requirements
From
Pontefract HQ

Concrete on the rail, off the rail, before the first service.

A rail possession has one outcome that matters. Track handed back to Network Rail by the time stated on the T-3 or T-12, signed off, fit for traffic. Anything else is a penalty, a notice, and a phone call you don't want.

Procon was built for that window. Volumetric mixers turn up loaded with raw materials, batch on-site, and pour to the exact volume the engineer signs off. No part-loads going hard in the drum if the possession slips. No eight cubes wasted if the dig comes in light.

Where the spec calls for rapid strength, our Ultra Rapid Set (URS) cement system, patented, gets the pour to working strength inside two hours. That's the difference between a 03:00 finish and a 05:00 finish. Between hand-back on time and a missed first service.

Every wagon carries the BS EN 206 conformity certificate and the BS 8500 delivery ticket. Drivers are inducted to each possession's site requirements before the shift. When the principal contractor wants the paperwork inside the welfare unit before pour, that's how we turn up.

We've poured on T-3 and T-12 possessions across LNER, TransPennine, Northern, and East Midlands. Ballasted track works, slab track repairs, OLE foundations, platform extensions, level crossings, station works, embankment patches. If it has a possession plan and a hand-back time, we know how to hit it.

Call dispatch. Send the possession plan. We'll batch to it.

WHY PROCON FOR RAIL
  • 01

    Two-hour set with URS

    Procon's patented Ultra Rapid Set gets the pour to working strength inside 120 minutes. First service runs as planned.

  • 02

    Inducted to your possession

    Drivers briefed and inducted to each possession's site requirements before the shift. No "we'll sort it on the day" surprises at the gate.

  • 03

    Volumetric, batch on chute

    Mix on-site to the cubic metre. Possession overruns don't cost you a full load.

  • 04

    EN 206 + BS 8500, before the first pour

    Conformity certificate and delivery ticket in the cab. RSSB-aligned hand-back paperwork prepared on request.

  • 05

    T-3 and T-12 ready

    Possession plan in, mix design signed off pre-dispatch, ETA confirmed by email and SMS the day prior.

  • 06

    Three depots, rail corridor coverage

    Warrington, Leeds, Pontefract. WCML, ECML, TransPennine, Cross Country all inside 90 minutes of a depot.

Where we pour

  • Ballasted track works
  • Slab track repairs
  • OLE foundations
  • Platform extensions
  • Level crossings
  • Station and concourse works
  • Embankment and cutting patches
  • Trackside drainage

Common questions

How do your drivers meet possession requirements?
Our drivers are inducted to each possession's site requirements before the shift. Where the principal contractor requires specific competencies, escorts or briefings, dispatch arranges them ahead of the possession date.
What's the hand-back protocol if a pour slips?
We don't dispatch a load until the possession plan and mix design are locked. If site conditions change mid-pour, the on-call batcher reworks the slump or strength inside the truck. With URS in the mix, two-hour set buys back the time most overruns would cost.
Can you supply T-3 possessions, not just T-12?
Yes. Short-notice T-3 possessions are bookable up to 16:00 the day prior with mix design signed off by the on-call batcher.
How does Ultra Rapid Set work for ballasted track?
URS reaches working strength inside two hours, which means foundation pads, OLE bases and slab repairs can be poured at 02:00 and trafficable by first service. The mix is BS EN 206 compliant and signed off pre-dispatch.
Do you handle remote trackside access?
Volumetric trucks reach RRAPs and access points across LNER, TransPennine and East Midlands routes. Where the access calls for a smaller wagon or a long hose run, dispatch confirms on booking.
What about ballast contamination control?
Volumetric pours mix only what discharges, so spillage is minimal. Where the principal contractor requires bunded delivery or containment, dispatch arranges before the possession.

Got a possession coming up?

Send the plan, the spec, the hand-back time. Dispatch will answer inside 30 minutes.

Get a rail quote

Get a volumetric concrete price in 30 minutes

  • BS EN 206 Compliant
  • Same-Day Available
Volumetric Concrete 24/7

Volumetric concrete. Mixed on your site. Pay for what you pour.

Same-day where we can, fresh every pour, across Yorkshire and the North West.

★★★★★ Rated 4.8/5 by Yorkshire & North West contractors

Leeds · Bradford · York · Sheffield · Wakefield · Manchester · Liverpool · Preston · Huddersfield · Halifax · & every site in between

Call us Get a price

Get a quick quote

Send the basics — we'll come back within 30 minutes.

or call 0800 001 6147